README for TestAssociate
-Author/Contact: tinyos-help@millennium.berkeley.edu
+Author/Contact: Jan Hauer <hauer@tkn.tu-berlin.de>
Description:
Criteria for a successful test:
Assuming one coordinator and one device has been installed, both should
-simultaneously switch on (only) the second LED. About 5 seconds later
-both should switch off the second LED.
+simultaneously switch on LED1. About 5 seconds later both should switch LED1
+off. That's all.
Tools: NONE