-A successful test will turn on both the green and blue (yellow)
-LEDs. A failed test is any other LED combination.
+ To use this application:
+
+ (i) Program a mote with this application (e.g. make telos install)
+ (ii) Wait until the red LED turns off (writing to flash is done)
+ (iii) Power cycle the mote and wait until the red LED turns off.
+ (iv) Repeat step (iii) and notice that the blink rate of the blue
+ (yellow) LED doubles each time the mote is power cycled. The
+ blink rate cycles through the following values: 1Hz, 2Hz, 4Hz,
+ and 8Hz.
+
+ The first time this application is installed, the green LED will
+ light up and remain on (indicating that the configuration storage
+ volume did not have the expected version number).
+
+ The red LED will remain lit during the flash write/commit operation.
+
+ The blue (yellow) LED blinks at the period stored and read from flash.
+
+ See Lesson 7 for details.